Master Plan Review

Vote YES on BB for Better Fallbrook High Schools & Facilities

The planning team was tasked with developing multiple options for consideration in the master plan for the long-term build out of the District’s sites. These options are included in the plan to demonstrate the flexibility in design to meet the needs of community priorities. For example, the aquatics center reconstruction was noted as a top priority for the community. The options presented in the plan explore variations in the scope and phasing of this project and the associated impacts to the site.

Master Plan Phases

Current Phase

  1. Building 400 Modernization and Structural Rehab

  2. New CTE Building and Site Improvements

  3. New Adult Transition Program

  4. Replace (8) Existing Portables, Site Improvements

  5. New Solar Panels and EV Charging

  6. HVAC Replacement

  7. New Agriculture Classroom Building and Site Improvements

Phase 2

  1. New 20 Classroom Building with Student Services Center

  2. New 38 Meter Pool and Aquatics Center Upgrades

  3. Ivy High School Library and Student Services Expansion

  4. New HVAC at Gym and Locker Rooms

  5. High Voltage Electrical Upgrade (Moved to Phase 1)

  6. New Marquee

  7. JROTC Obstacle Course

Phase 3

  1. Classroom Building Modernization (10, 20, 30, 40, 70)

  2. Modernize Aquatics Center Locker Rooms

  3. Gymnasium / Locker Expansion

  4. New Bleachers, Tickets, Concessions and Restrooms at Stadium

  5. New Softball Fields

  6. Re-locate Oasis

Phase 4

  1. Classroom Building Modernization (50,60,90)

  2. New Cafeteria and Art Building

  3. New Agriculture CTE Classroom Building and Site Improvements

  4. Relocate MOT

  5. Expand Parking Lot and Fields

  6. District office Expansion

Phase 5

  1. Light Modernization of Library, Gymnasium, Performing Arts Center

  2. New ASB, Student Store and Outdoor Courtyard

Current Phase Detail

Phase 1 Original Concept

Current Status

This Phase 1 has been created to accomodate all of the outstanding construction items thus far. Many have been completed, those that have not are either in process or waiting for final approval. This is the current list of Phase 1:

  1. New CTE Building and Site Improvements (Fallbrook High)

  2. Remodeled Library (Fallbrook High)

  3. Facelift to cafeteria (Fallbrook High)

  4. New Manufacturing, Transportation and Culinary buildings

  5. Electrical System Upgrades, including some areas of Phase 2

  6. “Legacy” Requirements (State regulated improvements)

  7. New Solar Panels and EV Charging (Paid from External Funding)

  8. HVAC Upgrades (Paid from External Funding)

Current Budget Status

In their 2023-24 report to the Board of Education, the FUHSD’s Measure AA Citizens’ Oversight Committee stated the audits “showed a healthy financial status for the District” and “prudent financial management.” The report concluded by stating:

In conclusion, the Citizens’ Oversight Committee remains vigilant in ensuring the prudent utilization of bond revenues, guided by the specific bond language and our committee’s bylaws. Our focus is to keep the District accountable and transparent in its financial dealings, and we look forward to continuing our service in the upcoming year.

Measure BB - Phase 2 Detail

Budget Priorities

  1. New 20 Classroom Building with Student Services Center

  2. New 38 Meter Pool and Aquatics Center Upgrades

  3. Ivy High School Library and Student Services Expansion

  4. New HVAC at Gym and Locker Rooms

  5. High Voltage Electrical Upgrade (Moved to Phase 1)

  6. New Marquee

  7. JROTC Obstacle Course

Phase 2 Concept

Phase 2 Concepts